Governments, Churches and Schools
The Co-op will provide single-phase or three-phase service to Government facilities, Churches and Schools. Single-phase lines will be extended to three poles (approximately 1,000 feet) at no cost to the consumer. Three-phase lines will be extended to one pole (approximately 300 feet) at no cost to consumer. Where additional facilities are requested, arrangements can be made through the cooperative's engineering department.
Deposits
| Governmental Agencies | No Deposit | | Churches and Schools | No Deposit |
Rates and Service Charges
Rates and service charges are based on the usage and demand of a facility. That usage and demand is then placed into rate categories. Government facilities, Churches and Schools usually fall under the following two rate categories:
Small Commercial
Code: 0010
Availability
Available from all areas served from the Cooperative's distribution system that have existing three-phase circuits of adequate capacity. Service to other areas may require a customer contribution in aid of construction.
Applicability
Applicable to commercial establishments having an expected peak monthly demand of less than 50 kW.
Character of Service
Single-phase service at 120/240 volts, three-phase service at 120/240 volts delta. Three-phase service of 120/208 or 277/480 volts wye available under special arrangements.
Monthly Rate
Customer charge: $28.15; plus $0.10141 per kWh for all kWh.
Minimum Bill
Minimum monthly bill shall be $28.15.
Adjustments
Service under this rate is subject to State and/or local sales tax as applicable. The current fuel adjustment shall be added to the Cooperative retail rate.
State Gross Receipt Tax: 4.0%
State Utility License Tax: 2.2%
Medium Power and Light
Code: 0002
Availability
Available from all areas served from the Cooperative's distribution system that have existing three-phase circuits of adequate capacity. Service to other areas may require a customer contribution in aid of construction.
Applicability
Applicable to establishments having an expected peak demand of 50 kW or greater.
Character of Service
Single-phase service at 120/240 volts or three phase service at 120/240 volts delta or 120/208 or 277/480 volts wye.
Determination of Billing
The monthly billing capacity shall be the measured maximum integrated 15 minute capacity during each billing period of approximately 30 days, measured in kW; provided however, that such capacity shall be taken at not less than 75 percent of the measured maximum capacity requirements established during the 11 months preceding the billing period or 75 percent of the contracted capacity, whichever is greater.
Monthly Rates
Customer Charge: $150.00; plus $9.50/kW for all kW over 10, plus energy charge of $0.07761 per kWh for all kWh.
Minimum Bill
Minimum monthly bill shall not be less than $150.00.
Adjustments
Service under this rate is subject to State and/or local sales tax as applicable. The current fuel adjustment charge shall be added to the cooperative retail rate.
State Gross Receipt Tax: 4.0%
State Utility License Tax: 2.2%
|