Disclaimer

Temporary Service

Consumers requiring service on a temporary basis shall be required to pay fees for connection and disconnection incidental to the supplying and removal of service. Such payment shall be required in advance as determined by the Cooperative's Policy on Service, Temporary Power to Construction site.

Temporary electric service for carnivals, revivals and other installations known or believed to be strictly of a short-term duration shall be installed at the expense of the applicant applying for electric service. An estimate of the cost of such service shall be calculated and collection made therefore in advance. Such costs to include, but not be limited to, the installation and removal plus the estimated cost of electric service for the period requested.